Why That ‘Cheap’ Shed Price Isn’t the Bargain You Think It Is (And How to Get an Honest, Fixed Price You Can Trust)
We’ve all been there. You start comparing shed prices, jotting down numbers, and one quote lands that’s a few thousand cheaper than the rest. You think, “Perfect - I’m saving money already.”
But that little victory doesn’t last long.
Because that “cheap” shed kit that looked like $30,000 on paper suddenly costs $40,000.00 or more once the builder arrives to put it up.
And by then, backing out isn’t an option. You’ve paid your deposit, you’ve committed, and walking away now would mean starting over, with a lighter wallet and a lot less confidence.
So how does this keep happening? And why do so many smart, careful people still get caught?
The Dirty Little Secret Every ‘Cheap’ Shed Quote Hides From You
When you buy a shed kit online or accept a quote over the phone, the engineering behind it is generic.
That means it’s designed for the best-case scenario - minimum wind, good soil, shallow foundations - whether your property needs it or not.
For example, let’s say your soil’s poor, and the right footing should be around 900mm deep. But the generic spec says 300mm.
That’s one third as deep and roughly 60% less concrete than you may need. When you run the numbers, that’s $5,000 - $10,000 extra just on concrete, because the shed supplier used blanket engineering instead of site-specific data.
What started as a “bargain” shed suddenly becomes one of the most expensive mistakes you’ll ever make.
But it’s not your fault; you were never told what you’re really paying for.
There’s A Reason This Happens Every Single Week Across Regional Victoria…
Because it sounds believable.
You call for a quote. They ask for your postcode, shed size, and roof type. A few clicks later, you’ve got a price that’s a few thousand less than everyone else’s.
Then you hear words like “We can assist with permits” and “Your shed will be ready in six weeks.”
Sounds reassuring, right?
But when you read between the lines, it becomes clear:
- “Assist with permits” usually means you’re doing the paperwork yourself.
- “Six weeks” refers to manufacturing - not the build.
- And the “cheap” price? That’s just for the shed kit, not the site work, slab, or construction.
And that’s when reality sets in. Because once the concrete trucks roll up, you find out who’s really responsible… or more accurately, who isn’t.
Consider What Happened to Greg… A Family Man Who Fell Into This Exact Trap
Greg was comparing shed quotes online and looking for a good deal.
One company’s price looked too good to pass up - especially once they told him the shed was fully engineered, ready to go, and could even be built right up against his house.
So Greg paid the deposit, feeling confident he’d scored a bargain.
But the moment the builder arrived, the truth came out. The shed couldn’t be built where he’d planned; the engineering didn’t allow it. Worse still, the footing design needed to be completely redone, and the new concrete costs alone would add thousands to the job.
Greg was gutted, sitting with a half-finished project, a pile of materials, and no one taking ownership for the mess.
And that’s the heart of the problem: most shed suppliers walk away long before the real work begins. We made it our mission to stay until the job’s done right.
Where Other Shed Companies Guess, We Guarantee
At Outdoor Steel, we don’t quote off Google Maps.
We visit your site, assess your soil, measure the slope, check the council requirements, and engineer your shed specifically for your block.
That means:
- No wasted concrete
- No last-minute variations
- No finger-pointing between contractors
Just a clear, fixed price you can count on from day one.
We handle everything in-house, including design, permits, concrete, and construction, so there’s one team, one contract, and one outcome: your shed, built properly.
Bottom Line: The Most Expensive Shed You’ll Ever Buy Is the One You Thought Was Cheap
A shed quote that skips the site visit is a setup for ‘savings’ you’ll always pay back later in concrete, delays, and stress.
If you want a shed price that’s real, start with a company that actually sees your site, understands your conditions, and takes full responsibility for the build.
That’s how you avoid nasty surprises and build with confidence.
Before You Sign Anything, Make Sure You Know What to Look for in a Shed Quote
Download our comprehensive Shed Buyer's Guide. It's packed with essential information about:
- Realistic timelines for each stage of your project
- How to avoid common delays and setbacks
- What's really involved in building a shed
- Questions to ask before choosing a shed company
- How to ensure your shed is built properly
Don't let cheap quotes derail your project. Get your free guide today and take the first step toward building your perfect shed, the right way.
Free Expert Advice Specific To Your Shed Needs
Over the past 20+ years we’ve had the honour of helping more than 5000 homeowners and farmers get a better looking, longer lasting garages and carports. We’d love to help you too by answering your questions and sharing our experience.